Centre brings out transmission plan for 5GW of offshore wind energy in T.N. https://ift.tt/1mQz5af - MAS News English

Breaking

Post Top Ad

Post Top Ad

Thursday, December 22, 2022

Centre brings out transmission plan for 5GW of offshore wind energy in T.N. https://ift.tt/1mQz5af

A report on transmission system for integration of over 500 GW of renewable capacity by 2030, released by Central Electricity Authority, the report has estimated the tentative cost of Inter State Transmission System for integration of 10 GW off-shore wind capacity at ₹28,100 crore

from The Hindu - Home https://ift.tt/1KmPary

No comments:

Post a Comment

Post Top Ad